CHM | Vallalba Renovables
Vallalba Renewables operates as specialized unit from Vallalba Group in the development technician y administrative of projects of solar energy.
We intervene from the early stages of the process: site identification, previous studies, land management, legal processing y obtaining authorizations. We also take care of the design y execution of critical infrastructures for the energy evacuationas substations o high voltage lines.
Our approach combines regulatory knowledge, territorial vision and collaboration with technical and financial partners that allow us to move forward safely in each development. We work to ensure that each renewable project is feasible, legally sound y energy-efficient.
We participated in the infrastructure implementation linked to the energy transitionincluding solar parks, wind and projects of biomass. Our work contributes to the development of a more sustainable energy modelreducing the dependence on non-renewable sources and decreasing the environmental impact. Each project reinforces our commitment to sustainability and with a energy future more clean y efficient.
We offer an integral modality under EPC contract management, where we assume full responsibility for the project, from design to operational handover.
As EPC contractors, we take care of:
Basic and detail engineering
Supply of materials and equipment
Management of civil works and electromechanical assembly
Supplier coordination
Technical supervision and control
System start-up
Initial operation and final delivery
This model allows us to act as a single interlocutor, reducing risks, optimizing time and ensuring quality in each phase of the project.
We also work under contracts of the following types BOS (Balance of System), where we execute all phases of the project except for the supply of photovoltaic panels.
In this model, coordination with the client is key, since the supply deadlines have a direct influence on the work planning. We take care of the execution of the rest of the system: civil works, structures, electrical installation, transformer stations and evacuation systems.
This approach is flexible, collaborative and requires technical expertise to ensure compatibility, efficiency and synchronization throughout the system.
At Vallalba Renewables we work with a clear objective: to be a key player in the transition to an energy model more sustainable, responsible y efficient. We promote the real adoption of renewable energies through viable projects, scalable y adapted to the needs of the present.
We aspire to a future where access to the clean energy is a reality within everyone's reach. To achieve this, we promote initiatives based on technological innovation, technical rigor y environmental commitment.
We believe that transforming the energy system is not only possible, but required. And we are determined to to lead that progress from the actionwith responsibility y long-term vision.
LSAT 132 KV connection with REE set
It is carried out under an EPC contract, based on the design, supply and construction of a solar park consisting of 35,600 panels of 570 WP of the latest generation with bi-facial technology.
30/132 KV AIS type AIS substation with 20 MVA transformer for connection of PSF ES MERCADAL with SET ORLANDIS 132 KV.
This substation has the following technical specifications:
Electrical substation and four associated auto-transformer stations supplying power to the high-speed line section between Medina del Campo (Valladolid) and Salamanca.
The implementation of self-consumption energy through 250 solar panels at a gas station represents an innovative approach to sustainability and reduced operating costs, while demonstrating a commitment to renewable energy.
The technical specifications of this installation are as follows:
Photovoltaic solar installation for self-consumption on a fixed installation of 15.3 kWP.
The La Valona building, belonging to the UMH, is an example of self-consumption and how clean energy is a must in every construction that is carried out today. This building has:
This self-consumption system has 700 Kwp, 6 Huawei 100 KVA inverters, with inverted system.
CHM is carrying out the study of different wind farms such as the Alto Maestrazgo wind farm located in Teruel and with 759 MW.
For the realization and implementation of these parks, CHM has the following tools:
Do you have a project related to renewable energies, are you looking for technical collaboration or do you need information about our services?
From Vallalba Renovables we attend consultations on development, processing and execution of photovoltaic infrastructures or other clean energy systems.