We design and build renewable energy plants that drive a cleaner and more efficient future. Since the engineering to the constructionwe offer integral solutions that ensure the maximum production at lower operating cost.

We have a specialized equipment and a network of trusted suppliers that allows us to deliver renewable infrastructures from high quality and safe. We are working to build a more sustainable, profitable and responsible energy model.

Efficient, profitable and sustainable renewable energies.

We generate clean energy from the design to the infrastructure construction that guarantee the maximum efficiency y profitability. We develop renewable energy projects that drive the transition to a sustainable energy model y environmentally friendly.

We work in the execution of solar and wind power plants and others clean technologiesensuring the emission reduction and the resource optimization. Our commitment is to build facilities that produce energy in the form of responsiblereducing the carbon footprint and guaranteeing a competitive return on investment for our customers.

Each renewable work we carry out contributes to a greener futureproviding energy solutions safe, sustainable and prepared for tomorrow's challenges.

EFFICACY

COMPETITIVENESS

R&D&I

GREAT TRAJECTORY

Management that guarantees the success of each project

PHOTOVOLTAIC ENGINEERING

TOTAL MANAGEMENT EPC, EXECUTION AND EFFICIENCY

We act as EPCists, We manage the industrial part of each photovoltaic plant in an integrated manner: engineering, supply, construction, electrical infrastructure and commissioning, coordinating all phases of the project until its entry into operation.

EPC INTEGRAL MANAGEMENT

We approach each project holistically, from engineering and technical definition to supply, construction, evacuation infrastructure and commissioning. We coordinate the various phases to offer a complete, reliable solution tailored to each installation.

Maximum efficiency and reliability

Our comprehensive approach allows us to ensure reliable, efficient and built-to-last solar installations. Each project is designed and built under sustainability criteria, ensuring the best energy performance with minimum environmental impact.

Agrisolar Es Mercadal

The "Agrisolar Es Mercadal" Photovoltaic Solar Park, in Menorca, stands out for its 20 MWp capacity and state-of-the-art bifacial technology. It integrates an 11 km high voltage subway network and a 30/132 KV elevator substation, guaranteeing maximum efficiency and a stable connection to the grid.

OUR EXPERIENCE

SOLAR PARKS

CHM acts as an EPCist, integrally managing the industrial part of photovoltaic plants: engineering, supply, construction, electrical infrastructure, evacuation and commissioning, coordinating the different phases until the plant goes into operation.
Aerial view of the Cap Blanc Solar Photovoltaic Park in Mallorca

Mallorca

PHOTOVOLTAIC SOLAR PARK CAP BLANC

Photovoltaic solar plant formed by the original installation and its expansion, with a combined installed peak power of 44 MWp and a nominal power generation 38.40 MWac.

44 MWp Installed peak power
38.40 MWac Nominal power
61.110 Photovoltaic modules
69,530 MWh Estimated annual production

The project incorporates bifacial photovoltaic modules on fixed structures and distributed conversion systems along the plant, in addition to the electrical infrastructure necessary for the transformation and evacuation of the energy generated. The project was carried out with a comprehensive approach, coordinating civil works, the assembly of structures, the installation of modules, and electrical systems to ensure the efficiency, reliability, and correct integration of all the plant elements.

Aerial view of Es Mercadal Solar Llucatx in Menorca

MENORCA

ES MERCADAL SOLAR (LLUCATX)

Agrisolar project located in Es Mercadal that combines photovoltaic generation with agricultural activity and the integration of uses compatible with the territory.

19,964 MWp Installed peak power
15.4 MWac Nominal power
35.586 Photovoltaic modules
36,924 MWh Estimated annual production

The performance also includes the electrical infrastructure necessary for the evacuation and management of the generated energy.

Aerial view of the Menorca Renovables III photovoltaic project in Es Mercadal

MENORCA

MENORCA RENOVABLES III

Photovoltaic project developed in Es Mercadal formed by two separate facilities: Benisseguí and Llinàritx Nou. Both are part of Menorca Renovables III and are connected by medium-voltage electrical infrastructure, making it possible to combine renewable generation with the agricultural and livestock uses of the territory.

30,39 MWp Installed peak power
29.37 MWac Nominal power
42.870 Photovoltaic modules
46.4 GWh Estimated annual production

INSTALLATIONS THAT INTEGRATE MENORCA RENOVABLES III

Benisseguí photovoltaic installation in Menorca Renovables III

MENORCA

BENISSEGUÍ

Photovoltaic installation located in Es Mercadal and integrated within Menorca Renovables III, combining renewable generation with the agricultural and livestock uses of the territory.

Photovoltaic installation Llinàritx Nou de Menorca Renovables III

MENORCA

NEW LLINARITX

Photovoltaic installation located in Es Mercadal and integrated within Menorca Renovables III, incorporating actions aimed at reconciling renewable generation with agricultural and livestock activity and biodiversity.

SUBSTATIONS AND POWER LINES

SET SA ROCA (MENORCA)

30/132 kV lifting substation associated with the photovoltaic installations of Es Mercadal and the infrastructure necessary for the transformation, control and evacuation of the energy produced.

  • Substation with lifting capacity 30/132 kV.
  • Control and measurement systems.
  • Transformation and evacuation infrastructures.
  • Engineering detail.
  • Control booth.
  • Electrical infrastructures associated with the project.

INDUSTRIAL SELF-CONSUMPTION

CHM develops photovoltaic self-consumption installations adapted to different types of buildings, industrial facilities and infrastructures, optimizing energy consumption and reducing operating costs through solutions designed for the specific needs of each project.

Photovoltaic self-consumption installation at Los Martínez Service Station

INDUSTRIAL SELF-CONSUMPTION

SERVICE STATION LOS MARTÍNEZ

Self-consumption photovoltaic installation developed to reduce the conventional energy consumption of the service station and improve the energy efficiency of the installation.

Installed power 104 kWp
Modules 262
Investors Huawei
Execution 2020
Self-consumption solar panels at the CHM facilities in Albatera, Alicante

ALBATERA · ALICANTE

CHM ALBATERA FACILITIES

Photovoltaic installation intended for the self-consumption of the CHM facilities in Albatera, contributing to covering part of the electrical demand through renewable generation.

Installed power 129 kWp
Modules 325
Investor Huawei SUN2000-100KTL-M0
Execution 2020
Self-consumption solar installation in the CHM Central Building in Alicante

ALICANTE

CHM CENTRAL BUILDING

Photovoltaic self-consumption installation in the CHM central building, integrated into the headquarters itself to reduce the energy demand coming from the grid.

Installed power 42 kWp
Modules 108
Investors Huawei
Execution 2020
Aerial view of the self-consumption photovoltaic installation of the Almansa Treatment Plant

ALMANSA · ALBACETE

DEPURATOR ALMANSA

Large-capacity photovoltaic self-consumption installation associated with the wastewater treatment plant, designed to cover a significant portion of the energy demand of the infrastructure.

Peak power 690 kWp
Nominal power 600 kW
Modules 1,200 × 575 Wp
Investors 6 × 100 kW
Estimated production 1,128,324 kWh/year
Photovoltaic self-consumption installation at the Fuente el Fresno wastewater treatment plant, Ciudad Real

FUENTE EL FRESNO · CIUDAD REAL

EDAR SOURCE EL FRESNO

Photovoltaic solar installation intended for the energy self-consumption of the wastewater treatment plant in Fuente el Fresno.

Installed power 55.35 kWp
Modules 123 × 450 Wp
Investor Kostal Piko CI-60
Power inverter 60 kW
Photovoltaic self-consumption installation in the UMH La Valona Building

UNIVERSIDAD MIGUEL HERNÁNDEZ

UMH BUILDING LA VALONA

Photovoltaic solar installation for self-consumption installed on the La Valona building of Miguel Hernández University.

Installed power 15.3 kWp
Modules 45 ATERSA
Investor INGECON SUN 15 TL M
Photovoltaic self-consumption installation of the UMH Departmental Building

UNIVERSIDAD MIGUEL HERNÁNDEZ

DEPARTMENTAL BUILDING UMH

Self-consumption photovoltaic installation without excess power developed for the Miguel Hernández University Department Building.

Power of the FV field 55.29 kWp
Nominal power 60 kW
Modules 97 × 570 Wp
Investor Huawei SUN2000-60KTL-M0
Mode Without surpluses

OUR EXPERIENCE IN PHOTOVOLTAIC

SOLAR PARKS

Projects that reflect our ability to address large-scale photovoltaic installations from a comprehensive management approach, combining engineering, construction, energy efficiency, and evacuation infrastructure.

Cap Blanc 3

Mallorca

PHOTOVOLTAIC SOLAR PARK CAP BLANC

Photovoltaic solar plant formed by the original installation and its expansion, with a combined installed peak power of 44 MWp and a nominal power generation 38.40 MWac.

44 MWp

Installed peak power

38.40 MWac

Nominal power

61.110

Photovoltaic modules

69,530 MWh

Estimated annual production

The project incorporates bifacial photovoltaic modules on fixed structures and distributed conversion systems throughout the plant to optimize energy performance and minimize electrical losses.
The energy evacuation is carried out through an underground 30 kV network connected to the Cap Blanc Substation, equipped with GIS technology and a 50 MVA power transformer.

34,784 t CO₂/year
Estimated emissions avoided

MENORCA

MINORCA RENOVABLES III SOLAR PHOTOVOLTAIC PARK

Our photovoltaic experience in Menorca includes large-scale projects It's Mercadal, Among them Llinàritx Nou, Binisseguí and Llucatx, With solutions that integrate renewable generation, electrical infrastructure, and compatibility with the agricultural and livestock uses of the territory.

30,39 MWp

Installed peak power

29.37 MWac

Nominal power

42.870

Photovoltaic modules

46.4 GWh

Estimated annual production

Menorca Renovables III integrates the photovoltaic blocks of Llinàritx Nou and Binisseguí, connected by underground medium-voltage lines to 30 kV with the Sa Roca 30/132 kV Substation.
The project also stands out for combining renewable energy generation with agricultural and livestock activities, incorporating measures such as grazing, agricultural utilization, and actions aimed at promoting biodiversity.

23,232 t CO₂/year
Estimated emissions avoided

WhatsApp Image 2026 10 15 at 10.29.53 2

LLUCATX

19,964 MWp

Agrisolar project located in Es Mercadal that combines photovoltaic generation with agricultural activity through the cultivation of lavender among the rows of solar panels.

BENISSEGUI 2

BINISSEGUÍ

10,44 MWp

Photovoltaic plant located in Es Mercadal that combines the production of renewable energy with the agricultural and livestock use of the land.

LLINARITX 9

NEW LLINARITX

19.95 MWp

Photovoltaic installation located in Es Mercadal that combines renewable generation with the existing agro-industrial activity and incorporates actions aimed at biodiversity.

OUR
LINES OF BUSINESS

Roads and Highways

Railway Works

Hydraulic Works

Building .

Firm

Road Maintenance

Services

Other Business Lines

We build roads that stand the test of time and use, guaranteeing quality and safety in every meter. But we don't stop there. We implement intelligent solutions to extend their useful life, optimizing each project with preventive and corrective measures that ensure their durability.

The future is built on rails. At CHM, we don't just build rail infrastructure, we drive mobility, connectivity and sustainability. We are proud to be part of the change, developing innovative projects that bring people together, optimize transportation and transform the environment.

Water is life, and managing it well is key to the future. At CHM, we build hydraulic infrastructures that guarantee its efficient use, conservation and availability. In a world where every drop counts, we make it flow with intelligence and sustainability.

We don't just build structures, we create spaces that drive the future. From residential housing to cutting-edge industrial facilities, we turn each project into a benchmark of quality, innovation and efficiency. Each project is a challenge, each achievement makes us stronger.

We apply advanced and sustainable solutions to build and rehabilitate more durable, safer and more efficient roads. It's not just about improving infrastructure, but doing it in a smart way, reducing environmental impact and maximizing performance.

Road maintenance is not only repairing, it is anticipating, protecting and guaranteeing the future of our roads. At CHM, we combine planning, technology and experience to keep roads in perfect condition, ensuring safety, efficiency and sustainability.

More than infrastructure, we ensure its operation. From building maintenance to wastewater treatment plant operation, from landscaping on university campuses to parking lot management, each service is focused on efficiency, sustainability and quality.

Experience and commitment to excellence go beyond traditional construction sites. The scope expands, innovation advances and solutions diversify to cover all infrastructure and construction needs.

Grupo Vallalba Image Founder

VALLALBA GROUP

We are a business group focused on infrastructure construction and management. We act with technical rigor to promote efficient and safe development.
chm

CONTACT WITH US

Do you have any questions or need assistance? Our team is available to answer you and offer you clear, agile and professional solutions.
Methodology-5S

WORK WITH US

Join a team where every project adds up. We are looking for people with talent, responsibility and commitment to move forward together in each project.