The structural work on the construction of 54 homes in Madrid for NeinorHomes, carried out by our Central Building Zone Delegation, is progressing.

These consist of a reinforced concrete structure with a grid-type floor system, divided into three residential blocks, with all

Foto2_NeinorHomesFoto6NeinorHomesFoto4NeinorHomesIMG-20170226-WA0000 IMG-20170309-WA0009

Other news